Image of Tailor-engineering about

RSS, Havelock North, Hastings, NZ

Appointed by Fulton Hogan to reinstate a watercourse bank in Havelock North, Hastings, NZ. The damage happened during cyclone Gabrielle - the bank was washed-out creating a small landslide. The design includes a vegetated 70 degrees RSS blending into the surronding landscape.

Image of Tailor-engineering
Image of Tailor-engineering
Image of Tailor-engineering
Image of Tailor-engineering
Image of Tailor-engineering
Image of Tailor-engineering

Contact us

    You authorize the processing of personal data in accordance with art. 13 of Legislative Decree 196/2003 and art. 13 of EU Regulation 2016/679, on the subject of "Personal Data Protection Code".