480 sqm (face) of green reinforced soil slope being installed for the new factory extension of Scavolini S.p.A., one of Italy’s top kitchen brand. Followed by 1,650sqm (face) reinforced SRW (segmental retaining wall). The SRW wall will have a total length of 290 m and a maximum retained height of approx 12m. Both reinforced geogrid structures will be constructed using Class 7D treated site won material.
Scavolini S.p.A.
Project Name
Scavolini S.p.A.
Year
2021
Main Client
Scavolini S.p.A.
Our Client
S.G. srl
Category
Location
IT
About this Project
Contact Us
Book a consultation
Schedule a meeting with our team to discuss your project requirements and the scope of work.